Compliance Statement
Scope of Use
Eproducts Penetration Seal has been appraised for use as a pipe and service penetration seal
for use where the penetration passes through the wall underlay on framed buildings within the
following scope:
¬ the scope limitations of NZBC Acceptable Solution E2/AS1, Paragraph 1.1 for timber-framed
buildings; or
¬ the scope limitations of NASH Building Envelope Solutions, Paragraph 1.1 for steel-framed
buildings; and,
¬ with a risk score of 0-20, calculated in accordance with NZBC Acceptable Solution E2/AS1 or
NASH Building Envelope Solutions, Table 2; and,
¬ with flexible and rigid wall underlays compatible with the seal and complying with the NZBC; and,
¬ situated in NZS 3604 and NASH Standard Part Two Wind Zones up to, and including, Extra High.
New Zealand Building Code (NZBC)
The product will, if employed in accordance with the supplier's installation and maintenance requirements, assist with meeting the following provisions of the building code:
- Clause B2 Durability: Performance B2.3.1(b)
Branz Appraised
- Clause E2 External moisture: Performance E2.3.5
Branz Appraised
Evidence
The product meets the requirements set out in the following documents, or relevant parts of cited standards within the documents:
Branz Appraised