Compliance Statement
Scope of Use
In wind zones up to and including Extra High as defined in NZS 3604:2011 or a maximum wind design pressure (ULS) of 2.5 kPa. Where the wind design pressure exceeds 2.5 kPa, specific design and detailing for structure and weathertightness is required. .
On timber or lightweight steel framing. A thermal break with an R-value of not less than 0.25 is required where used with lightweight steel framing.
As an external cladding system over a drained and ventilated cavity. The building must have a risk score of less than or equal to 20 when evaluated against the E2/AS1 risk. The system must be installed with a flexible building wrap or rigid underlay that meets the requirements Table 23 of E2/AS1.matrix.
Building height greater than 10 m and the upper floors contain sleeping uses or other property, the specification of the external wall must be in accordance with the BS 8414 and BR 135 tested assembly.
New Zealand Building Code (NZBC)
The product will, if employed in accordance with the supplier's installation and maintenance requirements, assist with meeting the following provisions of the building code:
- Clause B1 Structure: Performance B1.3.1, B1.3.2, B1.3.3, B1.3.3(a), B1.3.3(f), B1.3.3(h), B1.3.3(j), B1.3.3(p), B1.3.4
Seismic tested in accordance with AS/NZS 4284:2008 to +/-5.5 kPa by IANZ accredited test facility [Façadelab, 20/07/2022]. ALICLAD structural span analysis [Heco, n.d.]. - Clause B2 Durability: Performance B2.3.1, B2.3.1(b), B2.3.2
System componentry materials in accordance with Table 20 of Acceptable Solution E2/AS1, section 4 NZS 3604:2011, and Table 1 of Acceptable Solution B2/AS1. Expected life of maintained panels has an expected serviceable life greater than 15 years in Exposure Zones B, C and D ( refer NZS 3604:2011) - Clause C3 Fire affecting areas beyond the fire source: Performance C3.5, C3.6, C3.7
Tested in accordance with BR 135 and BS 8414, classified as pass [BRANZ, 8/09/2022]. Tested in accordance with ISO 5660-1:2015, achieved material group 1S [AWTA Product Testing, 31/03/2022]. Aluminium is deemed non-combustible (refer to definitions in C/AS2). - Clause E2 External moisture: Performance E2.3.2, E2.3.6, E2.3.7
Tested in accordance with AS/NZS 4284:2008 by IANZ accredited testfacility [FacadeLab, 20/07/2022
Notes
B1 Seismic tested in accordance with AS/NZS 4284:2008 to +/-5.5 kPaby IANZ accredited test facility [Façadelab, 20/07/2022].
C3 Tested in accordance with BR 135 and BS 8414, classified as pass [BRANZ, 8/09/2022].
E2 Tested in accordance with AS/NZS 4284:2008 by IANZ accredited test facility [FacadeLab, 20/07/2022;
Evidence
The product meets the requirements set out in the following documents, or relevant parts of cited standards within the documents:
B1 STRUCTURE: B1.3.1, B1.3.2, B1.3.3 (a, f, h, j, q), B1.3.4: Seismic tested in accordance with AS/NZS 4284:2008 to +/-5.5 kPa by IANZ accredited test facility [Façadelab, 20/07/2022]. ALICLAD structural span analysis [Heco, n.d.].
B2 DURABILITY: B2.3.1 (b), B2.3.2: System componentry materials in accordance with Table 20 of Acceptable Solution E2/AS1, section 4 NZS 3604:2011, and Table 1 of Acceptable Solution B2/AS1. Expected life of maintained panels has an expected serviceable life greater than 15 years in Exposure Zones B, C and D ( refer NZS 3604:2011)
C3 FIRE AFFECTING AREAS BEYOND THE FIRE SOURCE: C3.4(a), C3.5, C3.6, C3.7(a): Tested in accordance with BR 135 and BS 8414, classified as pass [BRANZ, 8/09/2022]. Tested in accordance with ISO 5660-1:2015, achieved material group 1S [AWTA Product Testing, 31/03/2022]. Aluminium is deemed non-combustible (refer to definitions in C/AS2)
E2 EXTERNAL MOISTURE: E2.3.2, E2.3.5, E2.3.7: Tested in accordance with AS/NZS 4284:2008 by IANZ accredited test facility [FacadeLab, 20/07/2022]
Design requirements
The below must be read in conjunction with the Design, Specification and Installation Guides. www.thebuildingagency.co.nz
The building must have a risk score of less than or equal to 20 when evaluated against the E2/AS1 risk matrix. Where the risk score exceeds 20, specific design and detailing for structure and weather tightness is required.
The system must be installed with a flexible building wrap or rigid underlay that meets the requirements Table 23 of E2/AS1.
Where fire-resistance rating (FRR) with respect to a relevant boundary applies, the specification of the external wall must be in accordance with the BS 8414 and BR 135 tested assembly.
Where the building has a building height greater than 10 m and the upper floors contain sleeping uses or other property, the specification of the external wall must be in accordance with the BS 8414 and BR 135 tested assembly.
Installation requirements
The below must be read in conjunction with the Design, Specification and Installation Guides.
All components are supplied pre-finished and must be treated as such to avoid damage both prior to installation and during installation. The product must be inspected on delivery and any damage noted and reported immediately. Components should be stored in a dry environment and clear of high foot and vehicle traffic or where construction work may damage the product. The components should be stored off the floor or ground on level supports spaced at no more than 600mm apart.
All exposed surfaces are covered in a protective plastic film to assist in protecting the finished product. The film should be left on for as long as practical during construction. Ideally when all on-site works are complete. In the case of two or more stories, the film should be removed as the scaffold is dismantled.
Maintenance requirements
Coating refer to www.duluxpowders.co.nz/ & www.specifyinterpon.co.nz/ & www.powdercoating.co.nz/metwood/
The coated surfaces of all the components are hard-wearing and durable but for best looks and durability the system needs a regular maintenance plan as detailed below but not limited to.
Dirt - any accumulation of dirt should be washed from the surface of the panels as soon as possible
Scratches and Dents - these need to be identified and the panels are removed and replaced.
Surfaces should be washed at least once a year using a soft brush with water and mild detergent. > Solvents or scouring cleaners should not be used.
Manufacturer
Legal Trading Name:
The Building Agency
Business Email:
info@buildingagency.co.nz
Contact Number/s:
9 4152669
Product Identifier
ALICLAD MAX
Warnings
This product has no warnings associated with it.
|
Date last validated:
03 April 2024 |
|
Date last updated:
03 April 2024 |
|